{"id":4523,"date":"2026-07-23T14:57:20","date_gmt":"2026-07-23T14:57:20","guid":{"rendered":"https:\/\/ribasinvest.com\/projects\/bolhrad-energy-park\/"},"modified":"2026-07-27T14:15:59","modified_gmt":"2026-07-27T14:15:59","slug":"bolhrad-energy-park","status":"publish","type":"project","link":"https:\/\/ribasinvest.com\/en\/projects\/bolhrad-energy-park\/","title":{"rendered":"Bolhrad Energy Park"},"content":{"rendered":"\n<section\n  id=\"project-info-block_61cd7297af820570cd9d280faac2660a\"\n  class=\"project-info container  alignfull\"\n>\n      <div class=\"project-info__title\" data-aos=\"fade-up\">\n      <h2>About the project<br \/>\nBolhrad Energy Park by Codex Energy<\/h2>\n    <\/div>\n  \n  <div class=\"project-info__description\">\n          <div class=\"project-info__description-col\" data-aos=\"fade-up\" data-aos-delay=\"200\">\n        Bolhrad Energy Park is an energy infrastructure asset that generates profit from two independent sources: a solar power plant and an energy storage system, integrated into a single managed Codex Energy system.      <\/div>\n    \n          <div class=\"project-info__description-col\" data-aos=\"fade-up\" data-aos-delay=\"400\">\n        The energy infrastructure provides long-term stability and a predictable income model.      <\/div>\n      <\/div>\n\n  <div class=\"project-info__blocks\">\n          <div class=\"project-info__block\" data-aos=\"fade-left\" data-aos-delay=\"100\">\n                  <div class=\"project-info__block-title\">\n            24.5% per annum          <\/div>\n        \n                  <div class=\"project-info__block-description\">\n            Average projected return of the model over 10 years in euros          <\/div>\n              <\/div>\n          <div class=\"project-info__block\" data-aos=\"fade-left\" data-aos-delay=\"200\">\n                  <div class=\"project-info__block-title\">\n            IV&#8217;26           <\/div>\n        \n                  <div class=\"project-info__block-description\">\n            Project launch           <\/div>\n              <\/div>\n          <div class=\"project-info__block\" data-aos=\"fade-left\" data-aos-delay=\"300\">\n                  <div class=\"project-info__block-title\">\n            3 months.          <\/div>\n        \n                  <div class=\"project-info__block-description\">\n            Regularity of interest payments          <\/div>\n              <\/div>\n          <div class=\"project-info__block\" data-aos=\"fade-left\" data-aos-delay=\"400\">\n                  <div class=\"project-info__block-title\">\n            \u20ac6.3 million          <\/div>\n        \n                  <div class=\"project-info__block-description\">\n            Total project budget          <\/div>\n              <\/div>\n          <div class=\"project-info__block\" data-aos=\"fade-left\" data-aos-delay=\"500\">\n                  <div class=\"project-info__block-title\">\n            6.3 MW \/ 4.5 MW           <\/div>\n        \n                  <div class=\"project-info__block-description\">\n            Solar power plant capacity          <\/div>\n              <\/div>\n          <div class=\"project-info__block\" data-aos=\"fade-left\" data-aos-delay=\"600\">\n                  <div class=\"project-info__block-title\">\n            49 years          <\/div>\n        \n                  <div class=\"project-info__block-description\">\n            Land lease term          <\/div>\n              <\/div>\n    \n      <\/div>\n<\/section>\n\n<section\n  id=\"project-gallery-block_24e08d33bb12c5de0a544057e4b89437\"\n  class=\"project-gallery  alignfull\"\n>\n  <div class=\"project-gallery__header container\">\n          <div class=\"project-gallery__title\" data-aos=\"fade-up\">\n        <h2>gallery<\/h2>\n      <\/div>\n    \n          <div class=\"project-gallery__description\" data-aos=\"fade-up\" data-aos-delay=\"200\">\n        <div class=\"project-gallery__description-text\">\n          Bolhrad Energy Park combines technology, location, and professional management to create a stable income-generating model.        <\/div>\n\n        <div class=\"project-gallery__control\">\n          <div class=\"project-gallery__btn-prev js-project-gallery-button-prev\" role=\"button\" aria-label=\"Slide prev\">\n            <img decoding=\"async\" \n              src=\"https:\/\/ribasinvest.com\/wp-content\/themes\/ribas-theme\/images\/icons\/arrow-right-in-circle.svg\" \n              alt=\"button-prev\" \n              loading=\"lazy\" \n              width=\"48\" \n              height=\"48\">\n          <\/div>\n          <div class=\"project-gallery__btn-next js-project-gallery-button-next\" role=\"button\" aria-label=\"Slide next\">\n            <img decoding=\"async\"\n              src=\"https:\/\/ribasinvest.com\/wp-content\/themes\/ribas-theme\/images\/icons\/arrow-right-in-circle.svg\" \n              alt=\"button-next\" \n              loading=\"lazy\" \n              width=\"48\" \n              height=\"48\">\n          <\/div>\n        <\/div>\n      <\/div>\n      <\/div>\n\n  <div class=\"project-gallery__gallery swiper swiper-container js-project-gallery\">\n    <div class=\"swiper-wrapper\">\n              <div class=\"swiper-slide\" data-aos=\"fade-left\" data-aos-delay=\"0\">\n          <a\n            class=\"glightbox-slide\"\n            href=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/generated-image-march-10-2026-8_10pm.png\"\n            data-lg-size=\"1362-768\"\n          >\n            <img decoding=\"async\"\n              src=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/generated-image-march-10-2026-8_10pm-768x433.png\"\n              alt=\"\"\n              width=\"622\"\n              height=\"568\"\n              loading=\"lazy\"\n            \/>\n          <\/a>\n        <\/div>\n              <div class=\"swiper-slide\" data-aos=\"fade-left\" data-aos-delay=\"200\">\n          <a\n            class=\"glightbox-slide\"\n            href=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/generated-image-march-10-2026-8_07pm.png\"\n            data-lg-size=\"1358-768\"\n          >\n            <img decoding=\"async\"\n              src=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/generated-image-march-10-2026-8_07pm-768x434.png\"\n              alt=\"\"\n              width=\"622\"\n              height=\"568\"\n              loading=\"lazy\"\n            \/>\n          <\/a>\n        <\/div>\n              <div class=\"swiper-slide\" data-aos=\"fade-left\" data-aos-delay=\"400\">\n          <a\n            class=\"glightbox-slide\"\n            href=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/generated-image-march-10-2026-7_58pm.png\"\n            data-lg-size=\"1362-768\"\n          >\n            <img decoding=\"async\"\n              src=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/generated-image-march-10-2026-7_58pm-768x433.png\"\n              alt=\"\"\n              width=\"622\"\n              height=\"568\"\n              loading=\"lazy\"\n            \/>\n          <\/a>\n        <\/div>\n              <div class=\"swiper-slide\" data-aos=\"fade-left\" data-aos-delay=\"600\">\n          <a\n            class=\"glightbox-slide\"\n            href=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/generated-image-march-10-2026-7_44pm.png\"\n            data-lg-size=\"1358-768\"\n          >\n            <img decoding=\"async\"\n              src=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/generated-image-march-10-2026-7_44pm-768x434.png\"\n              alt=\"\"\n              width=\"622\"\n              height=\"568\"\n              loading=\"lazy\"\n            \/>\n          <\/a>\n        <\/div>\n          <\/div>\n\n    <div class=\"js-project-gallery-pagination slider-pagination --light\"><\/div>\n  <\/div>\n<\/section>\n\n<section\n  id=\"project-advantages-block_73e8ea2a11427fb19fb470eea12b244c\"\n  class=\"project-advantages  alignfull\"\n>\n  <div class=\"project-advantages__content container\">\n          <div class=\"project-advantages__title\" data-aos=\"fade-up\">\n        <h2><b> What is the Bolhrad Energy Park?<\/b><\/h2>\n      <\/div>\n    \n    \n    <div class=\"project-advantages__blocks swiper js-project-advantages\">\n      <div class=\"swiper-wrapper\">\n                  <div class=\"swiper-slide\">\n            <div class=\"horizontal-image-card\" data-aos=\"fade-up\" data-aos-delay=\"0\">\n  <div class=\"horizontal-image-card__main\">\n    <div class=\"horizontal-image-card__icon\">\n          <\/div>\n\n    <div class=\"horizontal-image-card__info\">\n              <div class=\"horizontal-image-card__title\">\n          The project operates under a hybrid model that combines two sources of income:        <\/div>\n      \n              <div class=\"horizontal-image-card__description\">\n          \u2014 a solar power plant;\r\n\u2014 two energy storage systems (ESS);\r\n\u2014 operational management;\r\n\u2014 a private capital participation model via an energy cooperative.\r\n        <\/div>\n          <\/div>\n  <\/div>\n\n  <div class=\"horizontal-image-card__image\">\n    <img decoding=\"async\" width=\"366\" height=\"300\" src=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/foto-768x433.jpg\" class=\"attachment-medium_large size-medium_large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/foto-768x433.jpg 768w, https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/foto-300x169.jpg 300w, https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/foto-1024x578.jpg 1024w, https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/foto-1536x866.jpg 1536w, https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/foto.jpg 1560w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>  <\/div>\n<\/div>\n          <\/div>\n                  <div class=\"swiper-slide\">\n            <div class=\"horizontal-image-card\" data-aos=\"fade-up\" data-aos-delay=\"200\">\n  <div class=\"horizontal-image-card__main\">\n    <div class=\"horizontal-image-card__icon\">\n          <\/div>\n\n    <div class=\"horizontal-image-card__info\">\n              <div class=\"horizontal-image-card__title\">\n          The project operates on a hybrid model that combines two revenue streams:        <\/div>\n      \n              <div class=\"horizontal-image-card__description\">\n          Solar Power Plant (SPP) \u2014 electricity generation.\r\nEnergy Storage System (ESS) \u2014 electricity storage and participation in the electricity market by leveraging price differentials across different times of day.\r\n        <\/div>\n          <\/div>\n  <\/div>\n\n  <div class=\"horizontal-image-card__image\">\n    <img decoding=\"async\" width=\"366\" height=\"300\" src=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/generated-image-march-10-2026-8_18pm-768x431.png\" class=\"attachment-medium_large size-medium_large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/generated-image-march-10-2026-8_18pm-768x431.png 768w, https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/generated-image-march-10-2026-8_18pm-300x168.png 300w, https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/generated-image-march-10-2026-8_18pm-1024x574.png 1024w, https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/generated-image-march-10-2026-8_18pm.png 1369w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>  <\/div>\n<\/div>\n          <\/div>\n                  <div class=\"swiper-slide\">\n            <div class=\"horizontal-image-card\" data-aos=\"fade-up\" data-aos-delay=\"400\">\n  <div class=\"horizontal-image-card__main\">\n    <div class=\"horizontal-image-card__icon\">\n          <\/div>\n\n    <div class=\"horizontal-image-card__info\">\n              <div class=\"horizontal-image-card__title\">\n          Updated financial model        <\/div>\n      \n              <div class=\"horizontal-image-card__description\">\n          Following an update to the financial model, the company decided to expand the Bolhrad Energy Park by adding a second energy storage unit, thereby increasing the potential efficiency of the entire energy asset.        <\/div>\n          <\/div>\n  <\/div>\n\n  <div class=\"horizontal-image-card__image\">\n    <img decoding=\"async\" width=\"366\" height=\"300\" src=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/pir_1639-768x557.jpg\" class=\"attachment-medium_large size-medium_large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/pir_1639-768x557.jpg 768w, https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/pir_1639-300x218.jpg 300w, https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/pir_1639-1024x743.jpg 1024w, https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/pir_1639-1536x1114.jpg 1536w, https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/pir_1639-2048x1485.jpg 2048w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>  <\/div>\n<\/div>\n          <\/div>\n                  <div class=\"swiper-slide\">\n            <div class=\"horizontal-image-card\" data-aos=\"fade-up\" data-aos-delay=\"600\">\n  <div class=\"horizontal-image-card__main\">\n    <div class=\"horizontal-image-card__icon\">\n          <\/div>\n\n    <div class=\"horizontal-image-card__info\">\n              <div class=\"horizontal-image-card__title\">\n          The project is being implemented in Bolhrad, Odesa region.        <\/div>\n      \n              <div class=\"horizontal-image-card__description\">\n          Southern Ukraine possesses strong potential for solar energy development due to high insolation levels and a large number of sunny days per year.\r\nFor Codex Energy, this location is significant not only for generation purposes but also for the development of the region&#8217;s energy infrastructure.\r\n        <\/div>\n          <\/div>\n  <\/div>\n\n  <div class=\"horizontal-image-card__image\">\n    <img decoding=\"async\" width=\"366\" height=\"300\" src=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/dsc04033-768x513.jpg\" class=\"attachment-medium_large size-medium_large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/dsc04033-768x513.jpg 768w, https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/dsc04033-300x200.jpg 300w, https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/dsc04033-1024x684.jpg 1024w, https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/dsc04033-1536x1026.jpg 1536w, https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/dsc04033-2048x1368.jpg 2048w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>  <\/div>\n<\/div>\n          <\/div>\n              <\/div>\n\n      <div class=\"js-project-advantages-pagination slider-pagination --light\"><\/div>\n    <\/div>\n  <\/div>\n<\/section>\n\n<section\n  id=\"project-infrastructure-block_77473ac7934becd803fb69e710b090d5\"\n  class=\"project-infrastructure  alignfull\"\n>\n  <div class=\"container\">\n    <div class=\"project-infrastructure__header\">\n              <div class=\"project-infrastructure__title\" data-aos=\"fade-up\">\n          <h2>benefits of the project<\/h2>\n        <\/div>\n            \n      <div class=\"controls\">\n        <button class=\"controls__prev js-project-infrastructure-button-prev\" aria-label=\"Slide prev\">\n          <img decoding=\"async\" \n            src=\"https:\/\/ribasinvest.com\/wp-content\/themes\/ribas-theme\/images\/icons\/arrow-right-in-circle.svg\" \n            alt=\"button-prev\" \n            loading=\"lazy\" \n            width=\"48\" \n            height=\"48\">\n        <\/button>\n\n        <button class=\"controls__next js-project-infrastructure-button-next\" aria-label=\"Slide next\">\n          <img decoding=\"async\"\n            src=\"https:\/\/ribasinvest.com\/wp-content\/themes\/ribas-theme\/images\/icons\/arrow-right-in-circle.svg\" \n            alt=\"button-next\" \n            loading=\"lazy\" \n            width=\"48\" \n            height=\"48\">\n        <\/button>\n      <\/div>\n    <\/div>\n\n    <div class=\"project-infrastructure__blocks swiper js-project-infrastructure\">\n      <div class=\"swiper-wrapper\">\n                  <div class=\"swiper-slide\">\n            <div class=\"project-infrastructure__block\" data-aos=\"fade-left\" data-aos-delay=\"0\">\n              <div class=\"project-infrastructure__block-icon\">\n                                  <img decoding=\"async\" src=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/01\/globe.svg\" alt=\"Icon\" loading=\"lazy\" width=\"32\" height=\"32\">\n                              <\/div>\n\n              <div class=\"project-infrastructure__block-info\">\n                                  <div class=\"project-infrastructure__block-title\">\n                    A powerful location with high spawn rates                  <\/div>\n                \n                                  <div class=\"project-infrastructure__block-description\">\n                    Southern Ukraine receives approximately 1,400\u20131,600 kWh\/m\u00b2 per year and has more than 260\u2013280 sunny days, which allows for stable electricity generation throughout the year.                  <\/div>\n                              <\/div>\n            <\/div>\n          <\/div>\n                  <div class=\"swiper-slide\">\n            <div class=\"project-infrastructure__block\" data-aos=\"fade-left\" data-aos-delay=\"200\">\n              <div class=\"project-infrastructure__block-icon\">\n                                  <img decoding=\"async\" src=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2025\/12\/property-1lucide-iconblocks.png\" alt=\"Icon\" loading=\"lazy\" width=\"32\" height=\"32\">\n                              <\/div>\n\n              <div class=\"project-infrastructure__block-info\">\n                                  <div class=\"project-infrastructure__block-title\">\n                    Access to a broader consumer market                  <\/div>\n                \n                                  <div class=\"project-infrastructure__block-description\">\n                    Its location near the border (\u223c20 km from Moldova) places the project within a broader energy context, where demand is not limited to local consumption.                  <\/div>\n                              <\/div>\n            <\/div>\n          <\/div>\n                  <div class=\"swiper-slide\">\n            <div class=\"project-infrastructure__block\" data-aos=\"fade-left\" data-aos-delay=\"400\">\n              <div class=\"project-infrastructure__block-icon\">\n                                  <img decoding=\"async\" src=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/01\/history.svg\" alt=\"Icon\" loading=\"lazy\" width=\"32\" height=\"32\">\n                              <\/div>\n\n              <div class=\"project-infrastructure__block-info\">\n                                  <div class=\"project-infrastructure__block-title\">\n                    Stable demand for electricity                  <\/div>\n                \n                                  <div class=\"project-infrastructure__block-description\">\n                    The shortfall in electricity generation in Ukraine creates a constant demand for electricity, which provides a market for the electricity produced.                  <\/div>\n                              <\/div>\n            <\/div>\n          <\/div>\n                  <div class=\"swiper-slide\">\n            <div class=\"project-infrastructure__block\" data-aos=\"fade-left\" data-aos-delay=\"600\">\n              <div class=\"project-infrastructure__block-icon\">\n                                  <img decoding=\"async\" src=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/01\/star.svg\" alt=\"Icon\" loading=\"lazy\" width=\"32\" height=\"32\">\n                              <\/div>\n\n              <div class=\"project-infrastructure__block-info\">\n                                  <div class=\"project-infrastructure__block-title\">\n                    Automated Work Model                  <\/div>\n                \n                                  <div class=\"project-infrastructure__block-description\">\n                    Power generation and key management processes are designed to minimize human error, which reduces operational risks and enhances system stability.                  <\/div>\n                              <\/div>\n            <\/div>\n          <\/div>\n                  <div class=\"swiper-slide\">\n            <div class=\"project-infrastructure__block\" data-aos=\"fade-left\" data-aos-delay=\"800\">\n              <div class=\"project-infrastructure__block-icon\">\n                                  <img decoding=\"async\" src=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/02\/hand-coins-1.svg\" alt=\"Icon\" loading=\"lazy\" width=\"32\" height=\"32\">\n                              <\/div>\n\n              <div class=\"project-infrastructure__block-info\">\n                                  <div class=\"project-infrastructure__block-title\">\n                    Optimized delivery times                  <\/div>\n                \n                                  <div class=\"project-infrastructure__block-description\">\n                    The project is being implemented according to a clear timeline, which shortens the time from project initiation to the start of revenue generation.                  <\/div>\n                              <\/div>\n            <\/div>\n          <\/div>\n              <\/div>\n\n      <div class=\"js-project-infrastructure-pagination slider-pagination --light\"><\/div>\n    <\/div>\n  <\/div>\n<\/section>\n\n<section\n\tid=\"faq-section\"\n\tclass=\"accordion container  alignfull\">\n  <div class=\"accordion__header\">\n\t        <div class=\"accordion__title\" data-aos=\"fade-up\">\n\t\t\t  <h2><span style=\"color: #8cd3d6;\">Frequently<\/span> Asked Questions<\/h2>\n      <\/div>\n\t  \t  \n\t    <\/div>\n  \n  <div class=\"accordion__main\">\n    <div class=\"accordion__items\">\n\t\t  \t\t\t  \n\t\t\t          <div class=\"accordion__item\" data-aos=\"fade-up\" data-aos-delay=\"100\">\n          <div class=\"accordion__item-header\">\n\t\t\t\t\t  What stage is the project currently in?\n            <span class=\"accordion__item-header-icon\">\n                <svg width=\"40\" height=\"40\" viewBox=\"0 0 40 40\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\">\n                  <path d=\"M8.33398 19.9999H31.6673M20.0007 8.33325V31.6666\" stroke=\"black\" stroke-linecap=\"round\" stroke-linejoin=\"round\"\/>\n                <\/svg>\n              <\/span>\n          <\/div>\n\n          <div class=\"accordion__item-content\">\n\t\t\t\t\t  <p><span style=\"font-weight: 400;\">The project is currently in the active implementation phase.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Following an update to its financial model, Codex Energy has made a strategic decision <\/span><b>to expand the Bolhrad Energy Park<\/b><span style=\"font-weight: 400;\">by adding a second energy storage unit with a capacity of <\/span><b>3 MW<\/b><span style=\"font-weight: 400;\"> and a capacity of <\/span><b>10 MWh<\/b><span style=\"font-weight: 400;\">.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">At the same time, scaling up the project <\/span><b>does not affect the launch schedule for the main generation facility<\/b><span style=\"font-weight: 400;\"> \u2014 the second UZE is being implemented as a separate infrastructure component, so the planned commissioning dates remain unchanged.<\/span><\/p>\n          <\/div>\n        <\/div>\n\t\t  \t\t  \t\t\t  \n\t\t\t          <div class=\"accordion__item\" data-aos=\"fade-up\" data-aos-delay=\"200\">\n          <div class=\"accordion__item-header\">\n\t\t\t\t\t  What Does a Project Participant Receive?\n            <span class=\"accordion__item-header-icon\">\n                <svg width=\"40\" height=\"40\" viewBox=\"0 0 40 40\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\">\n                  <path d=\"M8.33398 19.9999H31.6673M20.0007 8.33325V31.6666\" stroke=\"black\" stroke-linecap=\"round\" stroke-linejoin=\"round\"\/>\n                <\/svg>\n              <\/span>\n          <\/div>\n\n          <div class=\"accordion__item-content\">\n\t\t\t\t\t  <p><span style=\"font-weight: 400;\">Project participants have the opportunity to become part of an energy asset without having to build, commission, or operate the plant themselves.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Codex Energy handles the entire process:<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u2014 development<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">\u2014 technical training<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">\u2014 structuring the model<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">\u2014 construction<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">\u2014 launch<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">\u2014 operational management<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">\u2014 working with contractors<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">\u2014 regular reporting<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">\u2014 support for participants<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For the participant, this is a form of passive investment in an energy infrastructure asset.<\/span><\/p>\n          <\/div>\n        <\/div>\n\t\t  \t\t  \t\t\t  \n\t\t\t          <div class=\"accordion__item\" data-aos=\"fade-up\" data-aos-delay=\"300\">\n          <div class=\"accordion__item-header\">\n\t\t\t\t\t  Legal Model\n            <span class=\"accordion__item-header-icon\">\n                <svg width=\"40\" height=\"40\" viewBox=\"0 0 40 40\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\">\n                  <path d=\"M8.33398 19.9999H31.6673M20.0007 8.33325V31.6666\" stroke=\"black\" stroke-linecap=\"round\" stroke-linejoin=\"round\"\/>\n                <\/svg>\n              <\/span>\n          <\/div>\n\n          <div class=\"accordion__item-content\">\n\t\t\t\t\t  <p><span style=\"font-weight: 400;\">The participation model is implemented through an energy cooperative.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The investor is granted the status of an associate member of the cooperative and the right to a share.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Important points to note when drafting the article:<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u2014 use a \u201ccontribution\u201d<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">\u2014 use the term \u201cassociate member of the cooperative\u201d<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">\u2014 use \u201cproject participant\u201d<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">\u2014 Indicate the return as \u201cestimated\u201d or \u201cpotential\u201d<\/span><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">\u2014 Do not present returns as guaranteed<\/span><\/p>\n          <\/div>\n        <\/div>\n\t\t  \t\t      <\/div>\n\n\t\t\t  \n\t        <div class=\"accordion__image\" data-aos=\"fade-up\">\n\t\t\t  <img decoding=\"async\" width=\"493\" height=\"524\" src=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2025\/12\/example-768x1152.png\" class=\"attachment-medium_large size-medium_large\" alt=\"\" loading=\"lazy\" srcset=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2025\/12\/example-768x1152.png 768w, https:\/\/ribasinvest.com\/wp-content\/uploads\/2025\/12\/example-200x300.png 200w, https:\/\/ribasinvest.com\/wp-content\/uploads\/2025\/12\/example-683x1024.png 683w, https:\/\/ribasinvest.com\/wp-content\/uploads\/2025\/12\/example.png 1024w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/>      <\/div>\n\t    <\/div>\n  \n\t\t\t<script type=\"application\/ld+json\">\n\t\t{\n    \"@context\": \"https:\/\/schema.org\",\n    \"@type\": \"FAQPage\",\n    \"mainEntity\": [\n        {\n            \"@type\": \"Question\",\n            \"name\": \"What stage is the project currently in?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"The project is currently in the active implementation phase.\\nFollowing an update to its financial model, Codex Energy has made a strategic decision to expand the Bolhrad Energy Parkby adding a second energy storage unit with a capacity of 3 MW and a capacity of 10 MWh.\\nAt the same time, scaling up the project does not affect the launch schedule for the main generation facility \u2014 the second UZE is being implemented as a separate infrastructure component, so the planned commissioning dates remain unchanged.\\n\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"What Does a Project Participant Receive?\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"Project participants have the opportunity to become part of an energy asset without having to build, commission, or operate the plant themselves.\\nCodex Energy handles the entire process:\\n\u2014 development\\n\u2014 technical training\\n\u2014 structuring the model\\n\u2014 construction\\n\u2014 launch\\n\u2014 operational management\\n\u2014 working with contractors\\n\u2014 regular reporting\\n\u2014 support for participants\\nFor the participant, this is a form of passive investment in an energy infrastructure asset.\\n\"\n            }\n        },\n        {\n            \"@type\": \"Question\",\n            \"name\": \"Legal Model\",\n            \"acceptedAnswer\": {\n                \"@type\": \"Answer\",\n                \"text\": \"The participation model is implemented through an energy cooperative.\\nThe investor is granted the status of an associate member of the cooperative and the right to a share.\\nImportant points to note when drafting the article:\\n\u2014 use a \u201ccontribution\u201d\\n\u2014 use the term \u201cassociate member of the cooperative\u201d\\n\u2014 use \u201cproject participant\u201d\\n\u2014 Indicate the return as \u201cestimated\u201d or \u201cpotential\u201d\\n\u2014 Do not present returns as guaranteed\\n\"\n            }\n        }\n    ]\n}\t\t<\/script>\n\t\t\n<\/section>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":4493,"template":"","meta":{"_acf_changed":false,"inline_featured_image":false},"commissioning_date":[97],"country":[102],"developer":[],"location":[298],"price":[299],"project_origin":[129],"project_tag":[188],"project_type":[300],"class_list":["post-4523","project","type-project","status-publish","has-post-thumbnail","hentry","project_tag-new-project"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Investing in Bolhrad Energy Park | Ribas Invest<\/title>\n<meta name=\"description\" content=\"Find out about the project Bolhrad Energy Park \u27a4 Investment in income property with professional management support\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ribasinvest.com\/en\/projects\/bolhrad-energy-park\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Investing in Bolhrad Energy Park | Ribas Invest\" \/>\n<meta property=\"og:description\" content=\"Find out about the project Bolhrad Energy Park \u27a4 Investment in income property with professional management support\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ribasinvest.com\/en\/projects\/bolhrad-energy-park\/\" \/>\n<meta property=\"og:site_name\" content=\"Ribas Invest\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ribasinvest\/\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-27T14:15:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/generated-image-march-10-2026-8_10pm-1024x577.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"577\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ribasinvest.com\\\/en\\\/projects\\\/bolhrad-energy-park\\\/\",\"url\":\"https:\\\/\\\/ribasinvest.com\\\/en\\\/projects\\\/bolhrad-energy-park\\\/\",\"name\":\"Investing in Bolhrad Energy Park | Ribas Invest\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ribasinvest.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ribasinvest.com\\\/en\\\/projects\\\/bolhrad-energy-park\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ribasinvest.com\\\/en\\\/projects\\\/bolhrad-energy-park\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ribasinvest.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/generated-image-march-10-2026-8_10pm.png\",\"datePublished\":\"2026-07-23T14:57:20+00:00\",\"dateModified\":\"2026-07-27T14:15:59+00:00\",\"description\":\"Find out about the project Bolhrad Energy Park \u27a4 Investment in income property with professional management support\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ribasinvest.com\\\/en\\\/projects\\\/bolhrad-energy-park\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ribasinvest.com\\\/en\\\/projects\\\/bolhrad-energy-park\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ribasinvest.com\\\/en\\\/projects\\\/bolhrad-energy-park\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ribasinvest.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/generated-image-march-10-2026-8_10pm.png\",\"contentUrl\":\"https:\\\/\\\/ribasinvest.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/generated-image-march-10-2026-8_10pm.png\",\"width\":1362,\"height\":768},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ribasinvest.com\\\/en\\\/projects\\\/bolhrad-energy-park\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/ribasinvest.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u041f\u0440\u043e\u0454\u043a\u0442\u0438\",\"item\":\"https:\\\/\\\/ribasinvest.com\\\/en\\\/projects\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Bolhrad Energy Park\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ribasinvest.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/ribasinvest.com\\\/en\\\/\",\"name\":\"Ribas Invest\",\"description\":\"Ribas Invest. \u0412\u0441\u0435 \u043f\u0440\u043e \u0433\u043e\u0442\u0435\u043b\u044c\u043d\u0438\u0439 \u0431\u0456\u0437\u043d\u0435\u0441\",\"publisher\":{\"@id\":\"https:\\\/\\\/ribasinvest.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ribasinvest.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/ribasinvest.com\\\/en\\\/#organization\",\"name\":\"Ribas Invest\",\"url\":\"https:\\\/\\\/ribasinvest.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ribasinvest.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/ribasinvest.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Logo.svg\",\"contentUrl\":\"https:\\\/\\\/ribasinvest.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Logo.svg\",\"width\":120,\"height\":41,\"caption\":\"Ribas Invest\"},\"image\":{\"@id\":\"https:\\\/\\\/ribasinvest.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/ribasinvest\\\/\",\"https:\\\/\\\/www.instagram.com\\\/ribas_invest\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@ribasinvest\",\"https:\\\/\\\/t.me\\\/ribasinvestment\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/ribas-invest\\\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Investing in Bolhrad Energy Park | Ribas Invest","description":"Find out about the project Bolhrad Energy Park \u27a4 Investment in income property with professional management support","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ribasinvest.com\/en\/projects\/bolhrad-energy-park\/","og_locale":"en_US","og_type":"article","og_title":"Investing in Bolhrad Energy Park | Ribas Invest","og_description":"Find out about the project Bolhrad Energy Park \u27a4 Investment in income property with professional management support","og_url":"https:\/\/ribasinvest.com\/en\/projects\/bolhrad-energy-park\/","og_site_name":"Ribas Invest","article_publisher":"https:\/\/www.facebook.com\/ribasinvest\/","article_modified_time":"2026-07-27T14:15:59+00:00","og_image":[{"width":1024,"height":577,"url":"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/generated-image-march-10-2026-8_10pm-1024x577.png","type":"image\/png"}],"twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/ribasinvest.com\/en\/projects\/bolhrad-energy-park\/","url":"https:\/\/ribasinvest.com\/en\/projects\/bolhrad-energy-park\/","name":"Investing in Bolhrad Energy Park | Ribas Invest","isPartOf":{"@id":"https:\/\/ribasinvest.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ribasinvest.com\/en\/projects\/bolhrad-energy-park\/#primaryimage"},"image":{"@id":"https:\/\/ribasinvest.com\/en\/projects\/bolhrad-energy-park\/#primaryimage"},"thumbnailUrl":"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/generated-image-march-10-2026-8_10pm.png","datePublished":"2026-07-23T14:57:20+00:00","dateModified":"2026-07-27T14:15:59+00:00","description":"Find out about the project Bolhrad Energy Park \u27a4 Investment in income property with professional management support","breadcrumb":{"@id":"https:\/\/ribasinvest.com\/en\/projects\/bolhrad-energy-park\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ribasinvest.com\/en\/projects\/bolhrad-energy-park\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ribasinvest.com\/en\/projects\/bolhrad-energy-park\/#primaryimage","url":"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/generated-image-march-10-2026-8_10pm.png","contentUrl":"https:\/\/ribasinvest.com\/wp-content\/uploads\/2026\/07\/generated-image-march-10-2026-8_10pm.png","width":1362,"height":768},{"@type":"BreadcrumbList","@id":"https:\/\/ribasinvest.com\/en\/projects\/bolhrad-energy-park\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ribasinvest.com\/en\/"},{"@type":"ListItem","position":2,"name":"\u041f\u0440\u043e\u0454\u043a\u0442\u0438","item":"https:\/\/ribasinvest.com\/en\/projects\/"},{"@type":"ListItem","position":3,"name":"Bolhrad Energy Park"}]},{"@type":"WebSite","@id":"https:\/\/ribasinvest.com\/en\/#website","url":"https:\/\/ribasinvest.com\/en\/","name":"Ribas Invest","description":"Ribas Invest. \u0412\u0441\u0435 \u043f\u0440\u043e \u0433\u043e\u0442\u0435\u043b\u044c\u043d\u0438\u0439 \u0431\u0456\u0437\u043d\u0435\u0441","publisher":{"@id":"https:\/\/ribasinvest.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ribasinvest.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ribasinvest.com\/en\/#organization","name":"Ribas Invest","url":"https:\/\/ribasinvest.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ribasinvest.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/ribasinvest.com\/wp-content\/uploads\/2025\/10\/Logo.svg","contentUrl":"https:\/\/ribasinvest.com\/wp-content\/uploads\/2025\/10\/Logo.svg","width":120,"height":41,"caption":"Ribas Invest"},"image":{"@id":"https:\/\/ribasinvest.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ribasinvest\/","https:\/\/www.instagram.com\/ribas_invest\/","https:\/\/www.youtube.com\/@ribasinvest","https:\/\/t.me\/ribasinvestment","https:\/\/www.linkedin.com\/company\/ribas-invest\/"]}]}},"_links":{"self":[{"href":"https:\/\/ribasinvest.com\/en\/wp-json\/wp\/v2\/project\/4523","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ribasinvest.com\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/ribasinvest.com\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ribasinvest.com\/en\/wp-json\/wp\/v2\/media\/4493"}],"wp:attachment":[{"href":"https:\/\/ribasinvest.com\/en\/wp-json\/wp\/v2\/media?parent=4523"}],"wp:term":[{"taxonomy":"commissioning_date","embeddable":true,"href":"https:\/\/ribasinvest.com\/en\/wp-json\/wp\/v2\/commissioning_date?post=4523"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/ribasinvest.com\/en\/wp-json\/wp\/v2\/country?post=4523"},{"taxonomy":"developer","embeddable":true,"href":"https:\/\/ribasinvest.com\/en\/wp-json\/wp\/v2\/developer?post=4523"},{"taxonomy":"location","embeddable":true,"href":"https:\/\/ribasinvest.com\/en\/wp-json\/wp\/v2\/location?post=4523"},{"taxonomy":"price","embeddable":true,"href":"https:\/\/ribasinvest.com\/en\/wp-json\/wp\/v2\/price?post=4523"},{"taxonomy":"project_origin","embeddable":true,"href":"https:\/\/ribasinvest.com\/en\/wp-json\/wp\/v2\/project_origin?post=4523"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/ribasinvest.com\/en\/wp-json\/wp\/v2\/project_tag?post=4523"},{"taxonomy":"project_type","embeddable":true,"href":"https:\/\/ribasinvest.com\/en\/wp-json\/wp\/v2\/project_type?post=4523"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}